Stirling Lodge
Images
Description of Project
Remove failed simulated wood shingles and replace with new Certainteed Landmark 40 dimensional asphalt shingles. Install new Grace Ice and Water Shield over entire roof surface and up walls, build new oversized wood crickets behind all chimneys, install new sheet metal flashings, new heat tape, gutters and downspouts.
Scope of the Project
Contract Amount
28,000 Sq./ Ft.,175 soldered 22 gauge pipe flashings clusters, 22 chimneys including new wood crickets, soldered 22 gauge cricket covers, soldered 22 gauge chimney caps with soldered flue flashings, decorative prepainted Kynar 500 chimney enclosures and prepainted step, head, sidewall and counterflashing.
$341,150.00
Project Manager
General Contractor
Andy Seppi Utah Tile & Roofing, Inc.
Affiliates
Owner

Certainteed Asphalt Shingles
Innovative Roofing Consultants
McNeil Engineering
Integris Metals
WR Grace

Stirling Lodge Home Owner’s Association
Challenges Associated With The Project
Completing a major reroofing project in a limited time frame. Project started September 1, 2003 and was completed 90 days. Extensive sheet metal details covering new plywood crickets, valley metal, custom step shingles, drip edges gutters and downspouts all fabricated from prefinished metal. Natural stone and wood siding was removed from all vertical surfaces 36" up from the roof surface so Grace Ice and Watershield could be installed.

 

| Home | Projects | Company Info | Affiliates | Our Pledge | Products |
| Safety | Services | Contact Info | Request Information | Roofing Assets |

©2003 Utah Tile & Roofing, Inc.
Developed and Hosted by Seppi Design