| Sally Mauro Elementary |
|
|
| Images |
|
|
| Description
of Project |
•Remove existing layers of roofing and install new metal roofing at sloped areas. Installation of new SBS cap sheet over tapered insulation at flat roof areas. |
| Scope of the Project |
Contract Amount |
•30,000 Sq. Ft. SBS modified roofing
•40,000 Sq. Ft. metal roofing |
•$580,000.00 |
| Project Manager |
General Contractor |
•Paul Seppi
•Jim Ritchie |
•Utah Tile & Roofing, Inc. |
| Affiliates |
Owner |
•Siplast - SBS Modified Roof System for flat roof areas
•AEP Span - Metal roofing for sloped areas |
•Carbon School District - Deon Kone |
Challenges
Associated With The Project |
•Removal of three existing roof systems including two PVC and the original built-up roofing.
•Install new two-ply SBS modified cap sheet roofing in cold adhesive over tapered roof insulation on flat roof areas and metal roofing over sloped roof areas. |